New Market Perspective
  • Business
  • Politics
  • Investing
  • World
  • Business
  • Politics
  • Investing
  • World

New Market Perspective

Investing

Major 50% Upgrade Boosts Lo Herma Uranium Resource to 8.57Mlbs, Scoping Study Initiated

by admin December 12, 2024
December 12, 2024
Major 50% Upgrade Boosts Lo Herma Uranium Resource to 8.57Mlbs, Scoping Study Initiated

GTI Energy Ltd (GTI or Company) is pleased to update the uranium Mineral Resource Estimate (MRE) at its Lo Herma Project (Lo Herma or the Project) located in Wyoming’s Powder River Basin (Figure 1). The MRE for the Project is focused on mining by In-Situ Recovery (ISR) methods and is reported at an appropriate cut-off grade of 200 ppm U3O8 and a minimum grade thickness (GT) of 0.2 per mineralised horizon as:

6.21 million tonnes of total mineralisation at average grade of 630 ppm eU3O8 for 8.57 million pounds (Mlbs) of eU3O8 contained metal classified as 2.78Mlbs of Indicated (32%) and 5.79Mlbs of Inferred.

Highlights

  • Lo Herma Mineral Resource Estimate increased 50% to 8.57Mlbs eU3O8 incl. 2.78Mlbs Indicated (32%) & 5.79Mlbs Inferred
  • Lo Herma Exploration Target increased from recent drilling and new staking
  • Lo Herma Scoping Study commenced – targeting completion in 1st half of 2025
  • GTI’s combined Wyoming uranium resources increased to 10.23Mlbs

The Lo Herma Exploration Target Range (ETR) for Lo Herma is also updated & increased (Table 1), since first reported to ASX on 05/07/2023, and now stands at a range of between 5.59 to 7.10 million tonnes at a grade range of 500 ppm to 700 ppm U3O8. GTI’s combined uranium MRE across its Wyoming projects, including the Great Divide Basin, is now 10.32Mlbs with an additional exploration target (Table 6).

The potential quantity and grade of Exploration Targets is conceptual in nature and there has been insufficient exploration to estimate a JORC-compliant Mineral Resource Estimate. It is uncertain if further exploration will result in the estimation of a MRE in the defined exploration target areas. In addition to drilling conducted in 2024, Exploration Targets have been estimated based on historical drill maps, drill hole data, aerial geophysics (reported during 2023) and drilling by GTI conducted during 2023 to verify the historical drilling information. There are now 954 drill holes in the Lo Herma project area with the 2023 and 2024 drill programs conducted by GTI designed, in part, to test the Lo Herma Exploration Target.

“We are delighted with the major uplift in Lo Herma’s uranium resource, now 50% larger at 8.57Mlbs. This important milestone positions Lo Herma favourably in size against Ur-Energy’s nearby 8.8Mlb Shirley Basin ISR build, and Encore Energy’s 8.1Mlb Gas Hills ISR project (refer Schedule 1). Importantly, over 30% of Lo Herma’s resource is lifted into Indicated classification with an expanded Exploration Target pointing the way to even greater potential for growth. Given Lo Herma’s proximity to several major ISR production facilities within 60 miles, we believe this project has strong potential to transition into production. Our immediate focus is completing a Scoping Study in the first half of 2025. This material resource upgrade plus the significant exploration target confirms our belief that 8.57Mlbs is just the starting point for Lo Herma.” Bruce Lane, Executive Director, GTi Energy.

LO HERMA URANIUM PROJECT – LOCATION & BACKGROUND

The Lo Herma ISR Uranium Project is located in Converse County, Powder River Basin (PRB), Wyoming. The Project lies approximately 15 miles north of the town of Glenrock and within ~60 miles of six (6) permitted ISR uranium production assets. These assets include UEC’s Willow Creek (Irigaray & Christensen Ranch) & Reno Creek ISR plants, Cameco’s Smith Ranch-Highland ISR facilities, Energy Fuels Nichols Ranch ISR plant & Ur-Energy’s Shirley Basin (Figure 1).

The Powder River Basin region has extensive ISR uranium production history with numerous defined ISR uranium resources, central processing plants (CPPs) and satellite deposits (Figure 1). The Powder River Basin region has been the backbone of Wyoming uranium production since the 1970s.

As reported to ASX on 14/03/2023, GTI acquired a comprehensive historical data package, with an estimated replacement value of over A$15m, for the Lo Herma region. The data package included original data for circa 1,771 drill holes for ~530,00 feet (~162,000m) of drilling in the Lo Herma region.

The original drill data was used to prepare an inferred MRE and an ETR for Lo Herma using the original exploration results. Subsequently GTI conducted a 26-hole exploration drill program in the winter of 2023 followed by a 73-hole resource development drill program in the summer of 2024, the results of which were previously reported on 20/12/2023, 31/07/24, 12/09/2024 & 19/09/2024 and support the updated MRE and ETR for Lo Herma shown in Table 1.

The potential quantity and grade of Exploration Targets is conceptual in nature and there has been insufficient exploration to estimate a JORC-compliant MRE. It is uncertain if further exploration will result in the estimation of a MRE in the defined exploration target areas. In addition to drilling conducted in 2024, Exploration Targets have been estimated based on historical drill maps, drill hole data, aerial geophysics (reported during 2023) and drilling by GTI conducted during 2023 to verify the historical drilling information. There are now 954 drill holes in the Lo Herma project area with drill programs conducted by GTI during 2023 and 2024 designed, in part, to test the Lo Herma Exploration Target.

LO HERMA MINERAL RESOURCE ESTIMATE (MRE) UPDATE

The updated Lo Herma MRE, in accordance with the JORC Code (2012), is presented in Table 2:

The MRE has been calculated by applying a cutoff grade of 200 ppm eU3O8 and a grade thickness (GT) cutoff of 0.2 GT. All available exploration data was evaluated using roll-front mapping techniques and modelled using GT contour methodology. GT contour modelling is widely accepted and used within the uranium industry for modelling roll-front style deposits. A range of criteria has been considered in determining resource classification including data quality, geologic continuity, and drill hole spacing which is discussed in Appendix 1, JORC code Table 1 report.

Click here for the full ASX Release

This post appeared first on investingnews.com

0
FacebookTwitterGoogle +Pinterest
previous post
Additional High Priority Antimony Targets Identified over 10km Corridor at Yallalong Project
next post
Gold Price Forecast: Top Trends That Will Affect Gold in 2025

Related Posts

Beyond Lithium Closes Flow-Through Offering for Gross Proceeds...

May 27, 2024

ARway.ai Introducing AR Navigation with Generative AI ChatGPT...

April 5, 2024

Harris vs. Trump: The 2024 US Election, Drug...

October 3, 2024

Forum Energy Metals and Global Uranium Announce the...

March 20, 2025

US Cannabis Sales Hit Record in October, Market...

December 3, 2024

JZR Gold Enters into Loan Agreement

February 12, 2025

Galan Lithium Limited (ASX: GLN) – Trading Halt

January 31, 2024

Appendix 4D and Half Yearly Accounts

February 27, 2025

Cosa Resources Announces Completion of Inaugural Diamond Drilling...

April 25, 2024

Lode Gold Confirms Geology Consistent to Adjacent Puma/Kinross...

January 21, 2025

    Get free access to all of the retirement secrets and income strategies from our experts! or Join The Exclusive Subscription Today And Get the Premium Articles Acess for Free


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Latest

    • Israel’s plan to ‘conquer’ Gaza is leaving Palestinians with little place to go: 5 maps show how

      May 31, 2025
    • US calls for Asia allies to boost defenses in face of China’s ‘imminent’ threat, Hegseth tells top defense forum

      May 31, 2025
    • US senators meet with Zelensky in Kyiv as doubt cast over upcoming Ukraine-Russia peace talks

      May 31, 2025
    • ‘A fear campaign.’ Students around the world are shocked, scared and saddened by US visa pause

      May 31, 2025
    • North Korea deploys mystery balloon-like objects to stricken warship, satellite photos show

      May 31, 2025
    • Iran has amassed even more near weapons-grade uranium, UN watchdog says

      May 31, 2025

    Popular

    • 1

      10 Top Oil-producing Countries (Updated 2024)

      October 19, 2024
    • 2

      Powered by rain, this seed carrier could help reforest the most remote areas

      December 19, 2023
    • 3

      Americans are starting to feel better about the economy and inflation

      December 13, 2023
    • 4

      A troubling theory about traders profiting from Hamas’ attack on Israel drew much attention. Why it may not be so simple.

      December 13, 2023
    • 5

      Top 10 Uranium-producing Countries (Updated 2024)

      April 18, 2024
    • 6

      Rare Earths Stocks: 8 Biggest Companies in 2024

      January 12, 2024
    • 7

      Investing in Graphene Companies

      May 9, 2024

    Categories

    • Business (1,343)
    • Investing (3,210)
    • Politics (4,206)
    • World (4,159)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Disclaimer: newmarketperspective.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.


    Copyright © 2025 newmarketperspective.com | All Rights Reserved